Ht-instruments HT950N Bedienungsanleitung Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 17
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
HT950N
EN - 8
5. OPERATIVE INSTRUCTIONS
5.1. INSTALLATION
For HT950N practice installation please consider the following specifications:
Installation zone must to be dust and corrosive gas free.
HT950N meter must to be installed:
Far from direct solar light and impact warm sources;
Far from MV devices (big meter counter, energy cables, SCR or TRIAC apparatus,
radiotransmitter).
You must prepare a square hole on 36.8 x 36.8 inch (height x width).
Insert HT950N and fix with standard screws and connectors.
5.2. ELECTRICAL CONNECTIONS
Please see the following Fig. 3 to execute all electrical connections on HT950N meter.
Fig. 3: electrical connections on HT950N meter
Seitenansicht 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 16 17

Kommentare zu diesen Handbüchern

Keine Kommentare